Service · Vaudreuil-Soulanges and the West Island
Bathroom renovation in Vaudreuil-Dorion
A bathroom rebuilt from floor to ceiling, with one person accountable for the plumbing, electrical, tile and finishing. Delivered clean, in 2 to 4 weeks.
Or call: 514-444-2391What is included
Everything below is in the written quote, line by line. Nothing is a surprise on the invoice.
- Demolition and disposal
- Walk-in shower or tub-shower, base and waterproofing membrane
- Electric heated floor under the tile
- Wall and floor tile, epoxy grout on request
- Vanity, fixtures, toilet, mirror and lighting
- Plumbing and electrical by licensed masters, coordinated by us
From our job sites
Real projects, photographed by our crew in Vaudreuil-Soulanges and the West Island.
How it goes
From the first call to the handover
Visit and measurements
We check the subfloor, ventilation and existing plumbing before pricing anything.
Material selection
Tile, vanity, fixtures: we point you to local suppliers and order everything before demolition starts.
Construction
Demolition, plumbing, electrical, membrane, tile, finishing. Only one bathroom? We schedule to keep the days without a shower to a minimum.
Final walkthrough
We test every tap and drain with you, and clean up before we leave.
The bathrooms we redo here
Many of the bathrooms we redo date from when the house was built: 1980s and 1990s master bathrooms in Les Cèdres and Pincourt, original bathrooms in L’Île-Perrot bungalows, where the tub often gives way to a walk-in shower. In Hudson we also redo period bathrooms without losing the house’s charm.
In Saint-Lazare, a large share of homes are on wells and septic systems. Adding a bathroom may require checking the septic system’s capacity, and hard water marks tile and fixtures, so we choose finishes accordingly and rough in for a softener if you want one.
Permits, RBQ licence and warranty
What is worth checking before you sign with any bathroom renovation contractor.
Permits in Vaudreuil-Dorion and Saint-Lazare
A permit is often required when plumbing moves or a wall is changed. We check with the City of Vaudreuil-Dorion, the Town of Saint-Lazare or your municipality, and prepare the paperwork with you. How long the permit takes is up to the town, not us; we file a complete application so it is not held up.
Schedule
Plan for 2 to 4 weeks of work. Materials are ordered before demolition, the toilet is usually back in service each evening and the shower is out of use for about 10 days while the membrane and tile go in.
RBQ licence and licensed trades
Construction 3 Lacs inc. has held general contractor licence RBQ 5788-4918-01 since 2020, bonded through the APCHQ. Plumbing and electrical are done by licensed masters that we coordinate and answer for.
Warranty
At handover you get the manufacturer warranties (vanity, fixtures, heated floor) and our subcontractors’ invoices, so everything is on file if you ever need it.
What it costs
A complete 50 sq ft bathroom lands in these ranges depending on the finish level, taxes included. Relocated plumbing and demolition are added on top.
Standard
Quality materials, common finishes
$16,499to$23,742
50 sq ft, taxes included
Premium
High-end finishes, quartz, glass
$21,449to$30,865
50 sq ft, taxes included
Luxury
Custom work, premium materials
$28,048to$40,362
50 sq ft, taxes included
References based on Québec market prices (about $350/sq ft in the standard tier). The firm price is confirmed in writing after a free visit.
Try the online estimatorQuestions homeowners ask
Before starting a bathroom renovation project with us.
How long will I be without a bathroom?
Plan for 2 to 4 weeks of work. The toilet is usually put back in service each evening, and the shower is out of use for about 10 days while the membrane and tile go in.
Do I need a permit to renovate a bathroom?
If plumbing is moved or a wall is changed, most towns in Vaudreuil-Soulanges require a permit. We check with your municipality and prepare the paperwork with you.
Can I convert my tub into a walk-in shower?
Yes, it is our most common request. We keep the existing drain when possible, otherwise the plumber relocates it. Plan for a custom base and a full membrane.
Is a heated floor expensive to run?
No. A bathroom heated floor on a programmable thermostat draws very little, and it is the comfort feature clients least regret.
Do you renovate bathrooms in Saint-Lazare?
Yes, Saint-Lazare is about fifteen minutes from us. If the house is on a septic system, we check it at the visit before adding a bathroom, and we adapt the finishes to hard water if you are on a well.
How much does a bathroom renovation cost?
For a complete 50 sq ft bathroom, plan for $16,499 to $23,742 in the standard range, taxes included. Relocated plumbing and demolition are extra. The firm price is confirmed in writing after a free visit.
Where we do this work
Based in Vaudreuil-Dorion. Each town has its own page with the local rules and the type of houses we see there.
- General contractor in Vaudreuil-DorionOur home base.
- Saint-LazareDetached homes on large lots, 1980s to today
- HudsonRedo a period bathroom without losing the charm.
- L’Île-PerrotReplace the original bathroom, tub for shower.
- Pincourt1990s master bathrooms due for a redo.
- Les Cèdres1980s and 1990s bathrooms due for a redo.
- RigaudOlder village houses, rural properties, cottages
Your town is not listed? We also work across the West Island (Pointe-Claire, Kirkland, Dollard-des-Ormeaux, Pierrefonds, Beaconsfield, Sainte-Anne-de-Bellevue), in Châteauguay, Vaudreuil-sur-le-Lac and everywhere in Vaudreuil-Soulanges. The visit is still free.

Tell us about your project
Call, write or send the form to discuss your project.
- 1. We call you backTo understand the project and set the visit.
- 2. Free visitWe measure and check site conditions.
- 3. Written quoteDetailed, line by line, no obligation.
- 514-444-2391
- info@construction3lacs.ca
- Vaudreuil-Dorion, Québec
